| This project was completed
in two phases. Phase one was the master planning of 10,000 square feet of
space in an existing retail development on the north side of Chicago. The
second phase was the development of 6,600 square feet that serves as an
office for six doctors. This included ten exam rooms, two cast rooms, one
x-ray bay and all required support spaces and offices. The master plan was
developed to include physical therapy spaces that would be seamlessly added
at some point in the future, without disruption to the present facility.
Full services were provided, including program development, schematic design, construction document preparation and construction administration. The scope of work included, but was not limited to, the following items:
Started January 2000,
this project was completed within the originally proposed time frame of
ten months. |